As offshore oil and gas exploration continues to expand to new depths and operations become larger than ever before, offshore platforms are demanding vast amounts of power and communications in order to operate. An increasing amount of platforms rely on submarine (subsea) cables that transport electric current at high voltage, from onshore power sources to offshore developments, to ensure a continuous operation. Aside from power generation, the industry also relies on cables to securely transmit data between offshore and land-based facilities.
Major oil and gas companies are developing increasingly integrated operations that rely heavily on expertise centres based onshore. Therefore, fast and reliable communication links between the shore-based hubs and the offshore assets are becoming critical for intelligent fields. High-speed fibre optic cabling has become an enabler of critical new functions such as remote operations, real time reservoir monitoring and remote control, which can also affect exploration and production results with improved efficiency.
According to TeleGeography, a subsidiary of the market research company PriMetrica, Inc., as of early 2019, there were approximately 378 submarine cables in service around the world (1.2 million kilometres of subsea cables in service globally), however, the total number of cables is constantly changing as new cables enter service and older cables are decommissioned.
Faster communications for Woodside
At Woodside’s North West Shelf (NWS) Gas Project asset, approximately 100 km of subsea fibre optic cable has replaced an outdated troposcatter radio communications network – a project completed five months ahead of the original 18-month schedule with big savings on first cost estimates.
The fibre optic cable is capable of providing a vast increase in bandwidth (1 Gbp/s) compared to the legacy troposcatter radio system (16 Mbps), and provides built-in future capacity of up to 10 Gbp/s.
“This opens up faster communications at the North Rankin Complex (NRC), vastly improves amenities offshore for all persons onboard, and also provides improvements for Goodwyn and Okha,” says project manager Chris Howard.
Besides increased productivity and better reliability of communications, it also means virtually unlimited possibilities, he adds.
Previous communication systems to NWS offshore assets have been through a troposcatter radio system installed onboard North Rankin A in 1984, with the last major upgrade in 2009. Troposcatter radio systems are predominantly used by the military and licensed with the Australian Communications and Media Authority (ACMA). However, recent ACMA licence changes have not been favourable towards the Woodside-owned system, increasing the risk for future licence renewals.
The troposcatter radio connected the NRC hub to Mount Wongama, three kilometres north of the Karratha Gas Plant (KGP), with all NWS offshore traffic funnelled to KGP for connection to Perth.
Cameron Macnaughtan, project implementation team lead, says the combination of the troposcatter radio being at capacity, equipment not supported by its vendor for the past three yearsand ACMA frequency licence changes meant “doing nothing was not an option”.
“The troposcatter had exhausted its potential for improvement and was maxed out every single day, so the only alternative was to invest in a subsea fibre optic cable system,” he says.
Chris says the NWS joint venture had looked several times over the years at installing a subsea fibre optic cable, but the goahead never eventuated.
However, through collaboration with the then NWS Gas asset manager Andrew Lobb, Sara Braund, the then chief information officer, and the telecommunications carrier, a change in contract strategy was forged whereby the telecommunications carrier owns, operates and maintains the network.
It helped reduce the cost by almost 50 per cent of the original estimate and seal the decision. Called the NWS Communications Upgrade project, it was approved in September 2016 after the strategy had been refined with the telecommunications carrier delivering the subsea fibre network construction.
“We also leveraged off an existing subsea telecommunications carrier fibre cable, opting to pre-invest in a branching unit, enabling the project to reduce potential infrastructure and capital intensive shore crossing scope,” explains Chris.
Woodside’s fibre optic cable for NRC piggybacks on this scope, as well as fibre optic installed in Persephone’s umbilical, which emerges at NRC. Woodside worked with a contractor to install the topside fibre optic cable, enabling a continuous fibre link between NRC and Woodside’s Perth headquarters. The project was completed in October 2017.
NWS Gas asset manager Paul Finch says: “It future proofs our ability to transport large volumes of data and process it in real time, enabling opportunities for us to become the operator of the future and leverage new ways of working in Mia Yellagonga.”
Shell and INPEX fibre optic collaboration
Another successful high-speed fibre-optic connection to major oil and gas assets was completed in late 2017 when the North-West Cable System (NWCS) was connected to the INPEX Ichthys LNG Project and Shell’s Prelude FLNG facility, located off the northwest coast of Australia.
The NWCS comprises 2100 kilometres of sub-marine cable and spans between Darwin and Port Hedland. The Prelude and Ichthys projects contributed equally to the construction of the system which commenced in 2014. The subsea fibre optic cable system has provided superior reliability and quality when compared to other available communications solutions such as satellite links. The system can deliver speeds of up to 40GB/s (gigabites per second) to both INPEX and Shell facilities and has the potential to scale well beyond that as technology matures. The NWCS was also designed to enable high speed data connections to other key hydrocarbon prospects along the cable route.
Louis Bon, Managing Director Ichthys Project said the close industry alliance enabled the cutting-edge communications system to be put in place.
“This is a great achievement for the Ichthys Project and an excellent example of what collaboration in the oil and gas industry can achieve,” Mr Bon said.
The connection of NWCS is a significant improvement to the services usually provided in an often neglected part of Australia and has also resulted in a fast and secure connection between families and fly-in, fly-out workers.
“Not only has this initiative strengthened the safe operations of the INPEX-led Ichthys LNG Project’s offshore facilities – it has also delivered immediate benefits to our teams,” he said.
He also said that both of these projects, far north of Port Hedland, have been connected to data centres that are located thousands of kilometres away in Perth. David Bird, VP Prelude added that the NWCS improved the collaboration of the company’s onshore and offshore teams during the commissioning and operation of Prelude.
“And importantly, has transformed the offshore experience for our offshore teams ensuring they are well connected to home and family,” he said.
Shell Prelude Asset Manager Jim Marshall said Prelude FLNG’s close proximity to Ichthys represented a significant opportunity for INPEX and Shell to achieve a better technical and commercial outcome. The subsea cable has given Shell a highly reliable and stable high-speed voice and data service which is essential for effective and efficient operations at its future offshore facilities.
“Our investment will also establish a valuable piece of infrastructure that has the capacity to support the development of future offshore resources in the Browse Basin.”
Sources: Submarine Cables and the Oceans – Connecting the World. Burnett D. et al., UNEP-WCMC; Trunkline Q4 2017, Woodside