Oil and gas explorer Indonesia Energy Corp. (IEC) has commenced crude oil production from its newly drilled K-29 well in Sumatra, Indonesia.
The well is currently producing via a jack-pump system, with crude being separated into storage tanks and sold directly to Pertamina, Indonesia’s state-owned energy company.
To further boost output, IEC is leveraging mobilised equipment on site to undertake a hydraulic fracturing operation on the K-29 well.
The field team is also actively assembling the same drilling rig at the nearby WK-5 well location in preparation for spudding by the end of October.
The upcoming WK-5 target is planned to reach a depth of approximately 5,200 feet, considerably deeper than the 3,400-foot K-29 well.
Designed around data from IEC’s extensive 3D seismic program, WK-5 will test deeper prospective formations, including a potential natural gas-bearing zone.
“I was extremely pleased to lead our delegation to the Kruh Block to celebrate production from K-29 and to visit the WK-5 location as we prepare to spud this exciting new well,” said IEC President Frank Ingriselli.
“We are excited by the progress at Kruh and look forward to the upcoming drilling of WK-5 as we continue working to increase production and unlock the potential of our assets.”
IEC continues to push forward with its development strategy to expand energy output and deliver value across its Indonesian basin acreage.
