Follow us:
Subscribe to our newsletter

logo

  • News
  • Projects
  • Business and Finance
  • Innovation
  • Products and Services
  • Events
  • Online Magazine
  • Advertise
  • Contact
Home
  • News
  • Projects
  • Business and Finance
  • Innovation
  • Products and Services
  • Events
  • Online Magazine
  • Advertise
  • Contact
Quotes by TradingView

Last major facilities contracts awarded for Barossa

06 Mar, 2020
239
Barossa
MODEC was previously awarded the contract to supply FPSO for the Barossa project. Image courtesy of MODEC.

Santos has awarded contracts for the supply and installation of subsea infrastructure for the Barossa project, the last major facilities commitments ahead of a Final Investment Decision (FID).

The contracts include the transport and installation of all the subsea umbilicals, risers, and flowlines, as well as the supply of the in-field flowlines, umbilicals and flexible risers.

Santos Managing Director and Chief Executive Officer Kevin Gallagher said these agreements are the final major facilities contracts to be awarded for Barossa before they push the button on the project’s development in the second quarter.

“They follow the award of the FPSO facility, subsea wells and subsea production system, and gas export pipeline tenders, with the contract for the drilling of the production wells to be awarded in the near future.”

“They represent the final stages of the front-end engineering design phase and give us greater certainty over cost and schedule for the Barossa development.”

The Barossa project area encompasses petroleum permit NT/RL5 located in Commonwealth waters, 300 kilometres north of Darwin, offshore Northern Territory.

The development concept consists of an FPSO, six subsea production wells, supporting in-field subsea infrastructure and a gas export pipeline tied into the existing Bayu-Undan to Darwin pipeline, supplying gas to Darwin LNG.

Santos holds a 25% interest in the Barossa joint venture along with partners ConocoPhillips (37.5% and operator) and SK E&S (37.5%). Santos is also a joint venture partner in Darwin LNG with an 11.5% interest.

On 14 October 2019, Santos announced the acquisition of ConocoPhillips’ northern Australia and Timor-Leste portfolio including its interests in Darwin LNG, Bayu-Undan and Barossa. Completion of the transaction and planned sell-down to SK E&S will see Santos’ interests in these assets increase to 43.4%, 43.4% and 62.5%, respectively. Santos is prepared to sell down equity in Barossa to a target ownership of 40-50% to achieve increased partner alignment.

Related Articles

Narrabri

Santos acquires pipeline to speed up Narrabri gas delivery

Spartan

Santos granted approval for Spartan gas field activities

Cooper Basin

Additional Cooper Basin rig investment to boost gas supply

Santos Dorado oil project moves forward with production licence

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

all news all projects

Latest Posts

  • Latest News
  • Latest Projects
12 Aug

IEA report shows global oil supply and demand rose in July 

12 Aug

LNG exporters must divert gas to the domestic market to avoid shortfalls

10 Aug

Sufficient gas available for domestic energy supply: APPEA

10 Aug

ADGSM review must maintain global investment confidence in Australia: APPEA

03 Aug

Toolkit supports actions for the Global Methane Pledge

12 Aug

Equinor’s H2H Saltend one of the first large-scale hydrogen projects in the UK

12 Aug

Santos acquires pipeline to speed up Narrabri gas delivery

11 Aug

Senex supplies $1 billion boost to natural gas industry

10 Aug

Gas shortage can be prevented with Port Kembla Energy Terminal

02 Aug

NOPSEMA approves Chevron’s Wheatstone activities

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe to our newsletter or print magazine

Our Titles

  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2022 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required